PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Paching Inside Elevator 1,2,3 shear walls Facing West.jpg pour concrete at Elevator 1,2,3 pocket 2nd floor Facing East.jpg Sprinkler piping at Stair -4 Facing North 2.jpg Sprinkler piping at Stair -4 Facing North.jpg VAV boxes at the 4th floor Facing South.jpg
Previous page VAV boxes at the 4th floor Facing South
VAV boxes at the 4th floor Facing South